Post Offer Free
Shanghai Yin An Pipe Co., LTD.  

Gold Index: 4364

You are here: home  > Heavy Wall Conduit Schedule 40 Galvanized Steel Pipe ASTM / EN / DN / JIS Standard

Heavy Wall Conduit Schedule 40 Galvanized Steel Pipe ASTM / EN / DN / JIS Standard 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: JDG series

Heavy Wall Conduit Schedule 40 Galvanized Steel Pipe ASTM / EN / DN / JIS Standard
 
 
<span s

Heavy Wall Conduit Schedule 40 Galvanized Steel Pipe ASTM / EN / DN / JIS Standard

 

 

We can supply 4000MM length JDG galvanized steel conduit pipes, and we provide OEM / ODM service with customized size.

 

Specification:

 

 

Product Name:

BS /ASTM /EN /DN/JIS Galvanized Steel Pipe

Size

OD

1/2-8" (20mm-355mm)

Wall Thickness

0.5mm-30mm

SCH30,SCH40,STD,XS,SCH80,SCH160,XXS etc.

Length

Less than 12m

Steel material

Q195 → Grade B, SS330,SPHC, S185

Q215 → Grade C,CS Type B,SS330, SPHC

Q235 → Grade D,SS400,S235JR,S235JO,S235J2

Q345 → SS500,ST52

Standard

BS EN10296,BS EN10025,BS EN10297,BS6323, BSEN10219,BSEN10217,GB/T13793-1992,GB/T14291-2006 GB/T3091-1993,GB/T3092-1993,GB3640-88

Usage

Used For Structure, Accessorize And Construction

Ends

1) Plain

2) Beveled

3) Thread with Coupling or cap

End protector

1) Plastic pipe cap

2) Iron protector

Surface Treatment

1) Bared

2) Black Painted (varnish coating)

3) Galvanized

4) With Oiled

5) 3 PE, FBE, corrosion resistant coating

Technique

Electronic Resistance Welded (ERW )

Electronic Fusion Welded (EFW)

Double Submerged Arc Welded (DSAW)

Type

Welded Pipe

Welded Line Type

Longitudinal

Section Shape

Round

 

 

Features:

 

1. Light weight:

To guarantee the strength condition of pipes, the pipe wall thickness is reduced, so that the construction of the pipe installation and handling  more conveniently.

 

2. Low price:

The wall is composed of thin wall instead of thick wall, which can save many steel materials, and the prices per unit length of pipe is reduced, thereby reducing the project cost.

 

3. Convenient construction:

Tube set connection style to fresh is buckled and connected to replace the traditional threaded or welded construction, and there is no need to do cross connection, both to ensure that the tube wall has good conductivity, but also eliminates the need for a variety of construction equipment and construction links, simplifying the construction so as to improve the work efficiency. It speeds up the construction schedule and save the construction cost.

 

4. Construction more safety:

Pipe construction without welding equipment, construction site no open flame, to eliminate the hidden danger of fire, to ensure the safety of the construction of the construction site, withhold convenient,

to improve the firmness.

 

Application area:

 

1, residential, urban and rural water supply and drainage, hot and cold water piping system

2, city gas system

3, the power cable protection system

2, industrial water and chemical transport and exhaust system

3, pure water, drinking water pipes and pipe fittings

4, drink, medicine production delivery system

5, compressed air pipes, pipe fittings

6, other industry and agriculture, pipe fittings.

 

bigPhoto
 Mr. Mr. Tan

Tel: 86-21-37777732
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Shanghai Yin An Pipe Co., LTD. [China (Mainland)]


Business Type:Manufacturer
City: Shanghai
Province/State: Shanghai
Country/Region: China (Mainland)

You May Like:

Product (94)